ย Navy Contracts โ€“ September 26, 2012

General Electric Co., Lynn, Mass., is being awarded a $327,458,062 modification to a previously awarded firm-fixed-price contract (N00019-11-C-0045) to provide additional funding for the procurement of 80 Lot 16 F414-GE-400 engines, two F414-GE-400 spare engines, and one high pressure turbine module.ย  In addition, this modification provides funding for long lead materials for the procurement of approximately 83 Lot 17 fiscal 2013 F414-GE-400 engines.ย  Work will be performed in Lynn, Mass. (59 percent); Hooksett, N.H. (18 percent); Rutland, Vt. (12 percent); and Madisonville, Ky. (11 percent), and is expected to be completed in June 2014.ย  Contract funds will not expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md. is the contracting activity.ย 

Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $79,930,653 not-to-exceed modification to a previously awarded advance acquisition contract (N00019-10-C-0002) for the manufacture and delivery of six F-35 Lightening II Full Mission Simulatorsย  In addition, this modification provides for a radar upgrade at Hill Air Force Base in support of F-35 radar cross section testing.ย  Work will be performed in Fort Worth, Texas (35 percent); El Segundo, Calif. (25 percent); Warton, United Kingdom (20 percent); Orlando, Fla. (10 percent); Nashua, N.H. (5 percent); and Baltimore, Md. (5 percent), and is expected to be completed in April 2015.ย  Contract funds in the amount of $716,700 will expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.ย 

Sikorsky Aircraft Corp., Stratford, Conn., is being awarded a $41,476,433 modification to a previously awarded indefinite-delivery/indefinite-quantity contract (N00019-07-D-0004) to exercise an option for security, project engineering, integrated logistics support, VH training and technical manual updates in support of VH Presidential Helicopter including special progressive aircraft rework of three VH-3D aircraft.ย  Funds will be obligated on individual delivery orders as they are issued.ย  Work will be performed in Stratford, Conn. (88 percent), and Quantico, Va., (12 percent) and is expected to be completed in September 2013.ย  Contract funds will not expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md. is the contracting activity.ย 

Navmar Applied Sciences,* Warminster, Pa., is being awarded a $41,463,854 cost-plus-fixed-fee, firm-fixed-price, cost reimbursable contract for a Phase III Small Business Innovation Research (SBIR) Project under Topics N92-170 โ€œLaser Detection and Ranging Identification Demonstrationโ€, N94-178 โ€œAir Deployable Expendable Multi-parameter Environmental Probeโ€, and AF083-006 โ€œLow Cost Intelligence, Surveillance and Reconnaissance, Unmanned Aerial Vehicle (UAV)โ€. ย This contract provides for the procurement of 21 persistent surveillance unmanned aerial systems TigerShark Block 3 (TSB3) XT