ย Navy Contracts โ€“ September 25, 2012

L-3 Communications Vertex Aerospace L.L.C., Madison, Miss., is being awarded a $126,477,094 modification to a previously awarded indefinite-delivery, requirements type contract (N00019-08-D-0014) to exercise an option for logistics services and materials for organizational, intermediate, and depot level maintenance required to support 28 T-45A and 171 T-45C aircraft based at the Naval Air Station (NAS) Kingsville, Texas; NAS Meridian, Miss.; and NAS Pensacola, Fla.ย  No funding will be obligated at time of award.ย  Funding will be obligated on individual orders.ย  Work will be performed in Kingsville, Texas (57 percent); Meridian, Miss. (36 percent); and Pensacola, Fla. (7 percent), and is expected to be completed in September 2013.ย  Contract funds will not expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md. is the contracting activity.ย 

The Boeing Co., Seattle, Wash., is being awarded a $15,419,872 cost-plus-fixed-fee delivery order against a previously issued Basic Ordering Agreement (N00019-11-G-0001) to procure the non-recurring engineering required to replace and integrate suitable hardware and software components in the P-8A Multi-Mission Maritime Aircraft Multi-Purpose Control Display Unit/Tactical Control Panel that have gone obsolete due to Diminishing Manufacturing Source and Material Shortages.ย  Work will be performed in Grand Rapids, Mich. (84 percent), and Seattle, Wash. (16 percent); and is expected to be completed in September 2014.ย  Contract funds in the amount of $15,419,872 will expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.ย 

The Boeing Co., Seattle, Wash., is being awarded a $9,066,407 modification to a previously awarded firm-fixed-price-incentive contract (N00019-09-C-0022) for repair of repairables and consumables replenishment in support of in-service P-8A Multi-Mission Maritime (MMA) Low Rate Initial Production (LRIP) aircraft.ย  Work will be performed in Seattle, Wash. (50 percent) and Dallas, Texas (50 percent), and is expected to be completed in March 2013.ย  Contract funds will not expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md. is the contracting activity.

ย