Leonardtown, MD โ€“ Snowfall ended in St. Maryโ€™s County late last night.ย  The National Weather Service is reporting snow deposits of up to 13.5โ€ are around the County, but much greater depths due to drifting snow are reported county-wide. Residents are being urged to limit travel on the roads while state and local highway crews continue snow removal operations.

Plowing operations along Priority 1 routes (475 lane miles) and Priority 2 and 3, secondary and sub division streets (785 miles) are ongoing and will continue until late this evening. Recovery operations on county roadways are expected to take 2-3 days to complete.ย  To check the progress of road crews, view the County Snow Removal map at http://www.stmarysmd.com/dpw/roadalertmap.asp.

As residents dig out from the storm please be aware of the National Safety Council basic tips for snow shoveling:

โ€ขย  Do not shovel after eating or while smoking
โ€ขย  Take it slow and stretch out before you begin
โ€ขย  Shovel only fresh, powdery snow; it’s lighter
โ€ขย  Push the snow rather than lifting it
โ€ขย  If you do lift it, use a small shovel or only partially fill the shovel
โ€ขย  Lift with your legs, not your back
โ€ขย  Do not work to the point of exhaustion

St. Maryโ€™s County Government will provide additional updates when warranted.